+
  • 1(1).jpg

1: 1. Closed epoxy primer

This product is a two component floor paint, consisting of A component (resin) and B component (curing agent) as solvent based coatings. It has low odor, good dryness, and strong sealing properties, belonging to the category of high viscosity and low permeability. It can effectively seal the floor foundation and has strong adhesion to the ground foundation.

Details

1、 Product Introduction
This product is a two component floor paint, consisting of A component (resin) and B component (curing agent) as solvent based coatings. It has low odor, good dryness, and strong sealing properties, belonging to the category of high viscosity and low permeability. It can effectively seal the floor foundation and has strong adhesion to the ground foundation.
2、 Usage method
1. Before use, thoroughly mix component A (resin) with an explosion-proof mixer and mix at high speed for 1-3 minutes
2. The A component (resin) and B component (curing agent) should be weighed using a standard measuring device according to the proportion indicated on the packaging label to ensure their accuracy. After mixing, they should not be mixed randomly to avoid affecting the curing effect of the material.
3. Pour the mixed AB components and the prepared materials onto the floor. Professional construction workers will work according to the construction requirements to achieve the desired effect. Generally, roller coating and scraping method are used, but it must be evenly applied.
4. For areas with poor ground foundation, it is necessary to apply multiple times to achieve sealing effect.
3、 Precautions
1. This product belongs to flammable chemicals, please stay away from ignition sources, and use explosion-proof motors for the mixer.
2. This product should be stored in a cool and ventilated place and should not be exposed to the sun.
3. When using this product, the temperature should not be lower than 5 ℃ for construction, as too low a temperature can affect the curing time. The humidity should not exceed 70%, as excessive humidity can cause whitening and uneven color on the surface of the paint film.
4. If materials are accidentally splashed into the eyes during the construction process, it is necessary to rinse them with clean water in a timely manner and send them to the hospital for treatment.
 

Other Products

I want to consult

Submission